Asset Risk Assessment

Find your next outage before it happens

Tractian engineers come to your plant, walk your critical assets, and hand you a structured risk report with failure exposure, peer benchmarks, and next steps.

Exclusive for qualifying plants.
Valued at $4,000. No charge for a limited time.

60%weighted probability of failure within 1 year
  • Air compressors80%
  • Centrifugal pumps44%
  • Three-phase motors16%

Deferred maintenance is how a $200 asset inspection becomes a $15,000 failure.

Trusted by over 2,000 U.S. and global manufacturers

What the report covers

Every section covers a different layer of the same problem. In the end, risk = probability of failure × consequence of failure.

Fleet Assessment

Example page from the Asset Risk Assessment report: Fleet Assessment Overview

01 / 07

Fleet Assessment Overview

A top-line reliability baseline: likely failure exposure, peer context, and the operational stakes across the fleet.

The failures plants like yours caught before they became outages

Manufacturing

$142k

avoided in costs

Bearing over-temperature trending was caught 11 days early on centrifugal pumps, before the issue turned into a larger production interruption.

Manufacturing Company

Energy

336 hours

of downtime avoided

A cooling tower gearbox vibration anomaly was caught during summer peak, turning a high-pressure failure scenario into a planned intervention.

Energy Company

Oil & Gas

$620k

avoided in costs

Bearing cascade risk was identified on a crude unit transfer pump before it became a critical production failure.

Oil & Gas Company

Food & Beverage

84 hours

of downtime avoided

Idler bearing failure on conveyors was caught during speed-normalized analysis before it shut down the line.

Food & Beverage Company

How it works

Most multi-site operations run 15–20% short on reliability staff. Our engineers bring the extra eyes to your floor.

  1. 1

    Request a window

    Tell us about your plant and pick a preferred date range two to three weeks out.

  2. 2

    Our account executive confirms

    An account executive reaches out within one business day, asks a few clarifying questions, and locks the date.

  3. 3

    We walk your plant

    Tractian engineers scope your assets onsite: criticality, operating context, and likely failure modes.

  4. You get the Asset Risk Assessment

    A structured risk report, reviewed with your team and ready to share with leadership.

Pick a preferred window.
Schedule your onsite.

Onsite capacity is limited. Choose the range that works for your team and an account executive confirms the exact date with our engineers.

Deferred maintenance is how a $200 motor inspection becomes a $15,000 failure.

By submitting the form, you agree to Tractian's Privacy Policy and that we may contact you about products and services.